Manufacturing order Format
Manufacturing order number and Date
Product Name
Job Quantity – job quantity is comes for the customer purchase order, full order quantity is need to mention here.
Customer Delivery Date – When customer are released the purchase order, in the purchase order expecting date of the material are indicate, this expecting of the material is the delivery date for the supplier.
Job start Date – As per manufacturing order what will be job starting date or when the job are going to start by company.
R.M. Location – material Transfer Date – Raw material Location and Material transfer date is the part of the planning, as per planned raw material location from production line material should transfer.
Target packing – Date of the packing
Finish product Location – material transfer Date – After the packing Material is storage temporary for storage till material shipping documentation, transportation arrangement are not done.
Target Date of Dispatch – When the material is going to dispatch
Job End Date – When the material is dispatch and customer is confirming that the material is reach at its place or its required location that the job is being over, here that one more thing is the transportation time is also showing hidden.
Manufacturing process
Process I & II
– Quantity
– U.M.O – unit of measurement
– Internal process Stage
– Rejection Quantity
– Cost of the process
– Passed Quantity
Inspection – Same as above both process I and II stages that requirements of the process and its costing, internal quality checking that rejection and passing quantity is are need to mentioned.
Packing – As above.
EXAMPLES, SAMPLES & FORMATS
MANUFACTURING ORDER FORMAT IN WORD DOCUMENT DOWNLOAD FREE
MANUFACTURING ORDER FORMAT IN PDF FORMAT DOWNLOAD FREE
MANUFACTURING ORDER FORMAT TEMPLATES DOWNLOAD
MANUFACTURING ORDER FORMAT IN JPEG, PNG FORMAT DOWNLOAD
You would also like to read:
- MANUFACTURING PROBLEM IDENTIFICATION SHEET
- GAP ANALYSIS FOR MANUFACTURING PROCESS
- MANUFACTURING PROCESS AUDIT CHECKLIST
- MONTHLY PRODUCTION PLAN FORMAT
- MATERIAL CERTIFICATE OF COMPLIANCE FORM
- MACHINE DOWNTIME REPORT
- PARETO ANALYSIS
- PRODUCTION ROUTE CARD
- PRODUCT ACCOUNTABILITY FORM
- LABOR PRODUCTIVITY
- QUALITY CONTROL AGENDA FORMAT
- PRODUCT/PROCESS QUALITY CHECKLIST
- DAILY OBSERVATION REPORT